What's new in the Operations Analytics module — every change that makes your day easier, in plain language, not developer-speak.
35 updates·updated weekly
November 2026
10
FeatureNew
Plan vs actual grid and a target range on trends
With the Production plan add-in, dashboards get a plan vs actual grid: per line the plan, the actual and the fulfilment, with a gap said in words rather than shown as zero; the KPI tile shows the plan vs actual pair too, and the PDF does the same. With the Quality specifications add-in, a quality metric's trend gets a target range (the range in force at the sample's time), and you can choose the "samples outside the target range" and "within target range (share)" views.
ImprovementNew
A more readable dashboard PDF: colour only where it means something
The dashboard PDF summary now has a neutral base: colour only carries meaning (below target, out of band, improved, worse) and is never decoration. Every coloured mark has a non-colour mark next to it — arrow and sign, ✓ / ✕ and a word, hatching, a dashed limit with a label, different line styles and direct labels — so it stays readable in greyscale print. The KPI card shows a large number, the change, the target with a verdict and the sample count; mini-chart labels are at least 7 pt. The screen has not changed.
FeatureNew
Diary headcount and tasks as metrics
Analytics gets two new sources from closed diaries. Headcount: people present, the number of posts and the posts filled — names are neither read nor aggregated. Tasks: due, done, carried-over and overdue tasks, and lead time in shifts, also broken down by type. Only closed diaries count; where there is no data, the completeness figure says so instead of showing zero.
FeatureNew
Event-log batch metrics on the dashboard
With the Batch records add-in, the figures of the event-log section of the Batches page can also be placed as tiles: closed and open batches, first-pass rate, the average number of corrections, time to specification (median) and the age of the oldest open batch — per plant, by product too. Rates and averages on the dashboard match the page; a median merged across plants is labelled as such on the tile.
FeatureNew
Ready-made dashboard packs for onboarding
Pre-built dashboard views are loaded into your organisation as data during onboarding, not assembled by hand. The load first shows what would change in a dry run; it is repeatable (a second run changes nothing) and reversible — the undo stops if you edited a view by hand in the meantime, so your own work is never overwritten. Tiles pass the same rules as in the editor; a faulty tile is never dropped silently.
ImprovementNew
Period picker in Analytics
The period label is now a button: depending on the view it opens a calendar, week rows with ISO week numbers, or a month or year grid, with shortcuts beside it (Today, Yesterday, This week, Last week, This month, Last month, This year). Stepping stays; the future is disabled, with the reason shown. On a phone it opens as a bottom sheet with large cells; it also works from the keyboard.
ImprovementNew
Longer sign-in without a code where two-step sign-in is not required
Where an organisation has no two-step sign-in requirement, lengthening the sign-in period no longer asks for a code. An organisation working 12-hour shifts can therefore set a longer session. If two-step sign-in is set up or required, lengthening still asks for a fresh code.
FeatureNew
Campaign and batch analysis: product filter, comparison, dashboard metrics
On the Campaigns page you can filter by product or see results grouped by product, never adding up figures of two products. New are the campaign comparison table, the failure-cause analysis (downtime hours by category), the trend of specific material use and the production summary as CSV. With the Batch records add-in the dashboard offers seven batch-plant metrics: quantity produced, by-product, availability, productive-time share, specific material use, downtime hours and plan adherence.
For batch production: the steps, hourly data and lab results of a batch on one sheet, carried forward from shift to shift. The sheet comes from a template you edit without code, versioned once published. At closing the system lists any missing required steps, the closed batch gets a content hash, and reopening or voiding asks for a reason. It needs the Data series that roll across shifts add-in and works without campaigns. A system administrator can request it on the Add-ins tab of the Control panel.
Lab link: limits and status per sampling point, and the sample is the same on the Data series page
Batch PDF in three views: Full, Summary, Traceability
Analytics → Batches with the Analytics module: cycle time, section time, out-of-limit rate, CSV
For plants that produce in campaigns: a campaign moves from the approved production plan to closure through phases (Planned → Start-up → optional Ramp-up → Production → Shutdown → Closed), with signed gates before each phase change, recorded in a hash chain. The start-up checklist comes from the plant’s base list or a template, and the shift completes it. A phase indicator sits in the diary header and the shift PDF, and progress is calculated from the quantities in closed diaries. A system administrator can request it on the Add-ins tab of the Control panel.
Campaign PDF record: created automatically at closure, with a QR verification page
Analytics → Campaigns: plan vs actual, burn-up, batch list
Who takes which exam: the checklist’s training item, with the Training module
Your organisation chooses the sign-in length: 4–13 hours
A sign-in lasts 8 hours by default, but your organisation’s administrator can set it between 4 and 13 hours — so it covers a 12-hour shift plus handover without signing out mid-shift. Nothing changes for existing organisations until they change it.
Modular core: permits and analytics work without the shift log
The shift log is now a switchable module: an organisation can run on Permit to Work and Analytics alone. The shared master data — site, plant, shift type, functional location — is always there, whichever modules are on.
FeatureNew
Company-level event recording and an “Events” dashboard in Analytics
Signed-in users can also record a company-level event from Reports → Events; it waits for classification and can be reassigned later. In Analytics a new “Events” view shows the trend and the breakdown by type, severity, source and status at company, site and plant level.
Maintenance: PM calendar, compliance report, asset tile and location-tree import
The PM calendar shows what is due in the next 30/90 days in week, month and list views. The compliance report measures how much was done on time, late or missed (CSV/XLSX export). The Analytics dashboard shows failures and recovery time per asset. The functional-location tree can be loaded from xlsx/CSV, with a preview.
The first tab of Control panel → Settings shows, across 19 steps, what is done, missing or blocked — one click to the exact setting. It names, for example, what a scheduled report still lacks to be sent, so it does not silently fail to go out.
ImprovementNew
Log and Analytics tested end to end: 304 scenarios, 18 fixes
We walked the shift log through 106 scenarios and Analytics through 198, and fixed the defects found. Among other things: a log correction now issues a new PDF version.
ImprovementNew
Invitations: delivery status and “Expired link”
If an invitation cannot be delivered (the email bounced), the list flags it with a badge. An expired link also shows on the list, with a clear error message. An invitation link is valid for at most 7 days.
For an English organisation, sign-in, invitation and factory texts are in English too
The organisation’s language applies even before sign-in; the invitation email and factory role names arrive in English, and the Permit to Work factory texts display in English — on existing permits too.
ImprovementNew
Photo viewer with ZIP export, and several photos in one log field
From the photo viewer the filtered photos can be downloaded as a ZIP (up to 500 photos and 500 MB), with a manifest. A log “Image” field can take 1–10 photos, and the log and its PDF show them all.
Functional-location master without the maintenance module
Master data → Functional locations has its own tab, editable even without the maintenance module. Your organisation can choose: an event’s location from the list only, or from the list or free text. Reports can be filtered by location too.
ImprovementNew
Analytics: several sites in one view, personal dashboards, saved permit reports
Analytics now answers for several sites at once. On the Overview, the “Site” filter chooses which sites a view combines, and the built-in “Sites overview” puts them side by side. You can build dashboards for yourself — a personal dashboard is visible only to you, a shared one to the team. The permit report’s setup can be saved under a name, with a relative period (“previous month”) too, and a saved view can go on a dashboard as a tile: as a table, bar chart or heatmap, also in the PDF and the scheduled email. The settings pages moved into one “Settings” menu, and an “Analyze” button on the Permit-to-Work list opens the report.
Company-wide dashboards: ratios are computed from the sites’ totals, not averaged
A report tile references the saved view — change the view and the tile follows
A per-person view can go only on a personal dashboard, never on a shared one or into a scheduled report
Permit reporting: flexible export, PDF package, pivot and company/person cards
Permit data now answers questions instead of just listing permits. The export’s columns and grain (one row = a permit, a person on a permit, a signature, a gas test…) are yours to choose, and the setup can be saved as a template. The permits’ PDFs come in one ZIP, with a verifiable manifest. In Analytics, the permit pivot breaks permits down by two dimensions — company, plant, type, month… — and behind most numbers is the list of permits (the ones that cannot be opened are marked with an asterisk). The company and person cards bring one contractor’s or one worker’s permits, hours, problems and expiring competences into one place.
Export templates with a relative period (“previous month”) and a full data package in Excel
PDF package: one PDF per permit + a manifest with SHA-256 hashes, up to 200 permits per request
Breakdowns by person and the cards sit behind a separate right; the card is a safety overview, not a performance review
Five pages for auditors and procurement: how the system shows that a signed permit or a recorded action was changed afterwards — the chained fingerprint, the daily external anchor and the QR code on paper. It also states the limits: what we do NOT claim.
Further towards NIS2: two-factor for everyone, versioned policies
Over the past weeks we kept strengthening the supplier side. Two-factor sign-in is available to every user, and your organisation can make it mandatory; the person affected gets an email when their two-factor is turned off or reset. Our internal security policies became controlled documents, with versions and change history, their content re-checked against the running system.
Your organisation can tighten the two-factor level — lowering it needs a fresh second factor
A failed release rolls itself back to the previous working version
The sub-processor list comes from one source, machine-checked against the legal pages
Until now a sign-in expired roughly every hour during a shift — the "Keep me signed in" box did not change that. From now on a sign-in lasts a full shift, 8 hours, so the box has been removed from the sign-in page. At the end of the shift the session expires; on a shared computer, still sign out when you are done.
No more signing in again every hour mid-shift
The session ends with the shift — the next colleague signs in under their own name
SecurityNew
A password change now signs you out everywhere else — and the audit trail has an external anchor
When you change or reset your password, every OTHER browser and device is signed out immediately — the session is revoked on the server, not left to expire on its own. A forgotten or compromised sign-in ends on its next click. On top of that, a per-tenant fingerprint of the audit trail is taken every day, chained and stored off-server: a later change to an already anchored day — even one made with owner rights inside the database — can be detected.
Revoked on the server, not left to expire — tested live
A daily, chained fingerprint of the audit trail, with no personal data
If your organisation falls under NIS2 (in Hungary, Act LXIX of 2024), you have to assess your suppliers too — and until now that work meant extracting the facts from us one question at a time. We now hand it over ready-made: a public page and a downloadable supplier data sheet that map the ten Article 21(2) measure groups onto what the system actually does. In an incident we notify you within 24 hours — that figure exists so your own 24/72-hour reporting deadlines stay achievable. Important: this is not a certification and it does not make you compliant; NIS2 applies to your organisation, what we do is make the supplier side verifiable. Our limits are stated on the same page.
All ten measure groups mapped — we deliberately make no compliance claim
Incident notification within 24 hours, partial information included
A downloadable data sheet for procurement — and we fill in your own questionnaire too
On exit you get everything back — with checksums, and a certified deletion
A supplier is easy to choose when it is easy to leave. Your full data set can now be handed over: EVERY data table in machine-readable (NDJSON) and spreadsheet-openable (CSV) form, with an inventory of stored files and a SHA-256 checksum per file, so you can verify the package is intact. The package also names whatever is deliberately left out of it, and why. If you then ask for deletion, we issue a certificate: what was deleted, the result of the post-deletion check, and the fingerprint of the export we handed over first. Data leaves the backups with the rotation, within 90 days at the latest — we say that plainly, because backups are taken of the whole database.
Every data table, not just the shift log — with a file inventory
A SHA-256 per file: the package can be verified as intact
A deletion certificate carrying the fingerprint of the prior export
A backup is worth what has been restored from it — so we did it. From the off-site backup (every 6 hours, to EU storage) we restored the entire database into a separate instance and counted: every table, every row and every user account came back intact. We checked the canonical shift-log PDFs separately: every one of them has its backed-up file, byte-for-byte identical to the original. The data itself restores in seconds. The full recovery time — which includes rebuilding a machine — is still being measured, and we will only state it once we can back it with a number.
Every table and every user account came back intact — counted, not assumed
Every canonical shift-log PDF is in the backup, byte-identical
What we have not measured, we say so — the full recovery time is not established yet
Archived PDFs now record HOW their fingerprint is verified
Every archived shift-log and analytics PDF has always carried a fingerprint (hash) that reveals whether the document was altered afterwards. From now on the record also states HOW that fingerprint is to be verified — because they are not all produced the same way. This matters in an audit: the wrong procedure would report a "mismatch" on a perfectly intact document, with nothing to reveal that the fault is in the method, not the document. We classified the existing archive retroactively too — by measurement, not assumption.
The record states the verification procedure — no guessing from the file name
Where the file alone cannot prove it, we say so instead of reporting a "mismatch"
The entire existing archive classified, by measurement
With the third phase, Permit to Work data flows into Operations Analytics: permits issued, gate-blocked attempts and throughput by type — broken down by site, plant and period. The data sits where the decision is: you can see which checkpoint stops work, and where.
Issued, gate-blocked attempts, throughput by type — on the dashboard
Site / plant / period breakdown, in one view with the other modules
SecurityNew
Operations Analytics — full security review
The module went through a comprehensive, multi-dimensional review, on real data too. No critical issue surfaced; the items found were fixed per good practice.
August 2026
3
ImprovementNew
A clearer dashboard editor
You pick saved views from a dropdown, and templates appear only on a button press — so the editing canvas sits right at the top. Tile settings show only what actually applies to that tile; the rest moved behind an “i”.
Saved-view dropdown
Template library on demand
Consistent width across every tab
FeatureNew
New module: Operations Analytics
Turn the data you already log into metrics and dashboards — trends, breakdowns, rankings, completeness. Any recorded data point can become a metric, and every number shows how complete it is.
A toggleable module with its own subscription
Every figure shows its data completeness
Targets and thresholds per metric
FeatureNew
Data export and scheduled reports
Download your reports to CSV or Excel — per period and per plant, with a separate column flagging missing data. Recurring reports can also go out by email automatically to the addresses you set.
CSV and Excel, with a completeness column
Scheduled email reports
Saved export presets
No entries in this view.
++++
Newsletter
Follow how OPEREX evolves
New modules, industrial shift-log tips and ISO 45001 practices — once a month at most, no spam.
Thanks for subscribing! 🎉You'll be the first to hear about new modules and industrial shift-log practices.