Entering the annual leave quota in hours or days

The Shift planner shows how much leave is left from a person’s annual leave quota and the leave days taken in the schedule. The system does not calculate the quota: payroll sets it (from age, children and other entitlements), you only enter it. You can enter it in hours or in days — it is stored in hours, and the two fields always show the same value.

  • Permission: saving the quota requires the Shift planner management right — scheduler:manage.
  • Prerequisite: the person is on the roster, and the site has a shift pattern (Settings → Site tab). Converting days needs the pattern’s hours.
  1. Open Shift planner → Settings → Leave quota, and pick the year with the year switcher.
  2. In the person’s row the Quota column has two fields: h and days. Enter the figure you received from payroll — the other field fills in by itself.
  3. Click Save quotas.

For a new person you can do the same when adding them: on the Roster tab the add row’s Leave quota (h) and Leave quota (days) fields record the quota for the current year. For someone joining mid-year, enter the pro-rata number of days payroll gave you.

One day is as many hours as the person’s working day:

Person One day 20 days
12-hour shift worker 12 hours 240 hours
8-hour day worker 8 hours 160 hours

A shift worker’s day comes from the site’s shift pattern, a day worker’s (and a day-standby person’s) from the day-worker pattern. Hours are rounded to whole hours, so half days work too (21.5 days × 8 hours = 172 hours).

  • After saving, the row’s Left column shows the remaining leave in days; hover over it to see the exact hours.
  • After a reload the hours and days fields still show the same value.
What you see Why What to do
The days field is greyed out the person’s daily hours cannot be read right now (the scheduling engine’s pattern list is not available, or the site has no pattern) enter the quota in hours; you can enter days later
“The quota entered in days could not be converted to hours…” the daily hours could not be read while saving enter it in hours, or try again later
A 12-hour shift worker’s 20 days show as 160 hours the person is a day worker on the roster fix their type on the Roster tab, then enter the days again

An empty field means no quota is recorded for this year — that is not the same as zero. Leave is consumed by the schedule: a leave day costs as many hours as the person would have worked that day under the rotation. The remainder is not carried over to the next year automatically.