Skip to content

Lean in office and administrative processes

≈ 2 min read · 425 words

Lean is not limited to manufacturing: the same principles (value, value stream, flow, pull, perfection) apply to office and administrative processes too. In office Lean the “workpiece” is typically a document, a decision or a piece of information, and the obstacles to flow are the unnecessary approvals, waits and manual data entry. Here too the goal is to shorten the lead time and eliminate non-value-adding administration.

lean-iroda-en.svg The office process maturity matrix: repetitive office processes are assessed in three dimensions (processes, support, colleagues) on the never–sometimes–often–always scale. The survey shows where the operation is immature (on the left, “Never”) and in which direction to move, toward the mature state (“Always”).

  • Myth busted: Lean is not only manufacturing, not a car-factory system, and not a toolbox.
  • The “workpiece” here: document, decision, information.
  • Typical office wastes: unnecessary approval, manual data entry, waiting, too many decision points.
  • Goal: shortening the lead time and eliminating non-value-adding administration.
  • Measured result (a process-industry site): less approval and administration time, shorter lead time.
  1. Assess the maturity of the processes (on a never–sometimes–often–always scale) in three dimensions:
    • processes: do the repetitive tasks follow the same process, is the lead time known, are they efficient;
    • support: a clear division of roles and responsibilities, knowing the current status against the standard, clear expectations;
    • colleagues: initiating the following and improvement of the processes, adequate training, keeping the agreements.
  2. Map the document/information flow and the decision points (VSM).
  3. Introduce a pull system: a step should start only when the next one gives a signal.
  4. Make the problems immediate, online and visible (visual management).
  5. Standardize and sustain.

The measured results of a process-industry site’s Lean Wave (an office/approval process): less approval time, less administration time, better collaboration, a shorter lead time — by reducing the number of approval steps and administrative documents. In the process industry, permitting and procurement administration ties up significant non-value-adding time.

Is it true that Lean can only be used in manufacturing?

No. The Lean principles apply to office, administrative and service processes as well — the source explicitly highlights that Lean is not the production system of car factories but a general process approach.

What is a typical waste in an office process?

The unnecessary approval loops, manual data entry, waiting and too many decision points — these stretch the lead time without creating any value.

Lean basics · flow · pull system · the three types of activity · vsm